HOME / PROJECTS
Selected Projects
Pilbara, Western Australia
May 2026
Deep-Water Physical Oceanography Monitoring for Environmental Impact Assessment
GAIA Marine delivered a complex deep-water physical oceanography monitoring program in a remote Indonesian offshore setting, successfully deploying, servicing and recovering subsurface moorings to collect current, temperature, water-level and wave data for project planning and environmental assessment.
Pilbara, Western Australia
May 2026
Baseline Underwater Acoustic Monitoring for Marine Energy Infrastructure
GAIA Marine delivered a two-station underwater acoustic monitoring program to establish baseline sound conditions for a proposed marine energy development, providing practical evidence to support environmental assessment, project planning and review of existing anthropogenic noise influences.
Pilbara, Western Australia
May 2026
Post Cyclone Hydrographic Assessments
GAIA Marine completed a targeted shallow-water multibeam hydrographic survey in Dampier following recent cyclonic activity, delivering high-resolution seabed and infrastructure-adjacent bathymetry to support condition assessment, damage review and future change detection across priority port areas.
Pilbara, Western Australia
November 2025 – March 2026
Integrated Shallow-Water Survey for Port Infrastructure Upgrade
GAIA Marine delivered an integrated shallow-water survey program in the Pilbara, combining USV-based multibeam bathymetry, sub-bottom profiling, metocean monitoring and benthic habitat assessment to support port infrastructure planning in a constrained operational marine environment.
Pilbara, Western Australia
November 2025
Benthic Habitat Assessment for Port Maintenance Planning
GAIA Marine completed a high-level benthic habitat assessment in the Pilbara, using drop-camera imagery, georeferenced site records and a standardised habitat classification framework to support port maintenance and planning activities.
Pilbara, Western Australia
November 2025
USV Bathymetry and Benthic Survey for Jack-Up Barge Mooring Assessment
GAIA Marine delivered a focused shallow-water survey for a jack-up barge mooring assessment in the Pilbara, combining USV-based multibeam bathymetry and drop-camera benthic habitat survey to support nearshore port infrastructure planning.
Victoria, Australia
August 2025
Benthic Habitat Survey for Marine Infrastructure Project (Winter)
Following the successful summer baseline campaign, GAIA Marine returned in winter to complete an expanded benthic habitat survey, delivering repeatable towed-camera acquisition, georeferenced imagery and high-resolution metadata across a revised marine infrastructure survey area.
Victoria, Australia
June 2025
Environmental Baseline Sampling for Offshore Energy Development
GAIA Marine delivered an offshore environmental baseline sampling campaign in Victoria, collecting sediment, water-column and benthic visual data to support future offshore energy development planning and environmental assessment.
Engage
Project on the horizon?
Tell us your scope and we’ll come back with the right approach.